TC Tech Infra delivers end-to-end infrastructure deployment services for multinational IT programs in Brazil. From datacenter buildouts to enterprise network rollouts, we execute with SLA alignment, full documentation, and compliance to your global standards.
Our infrastructure deployment teams handle physical IT buildouts at enterprise scale. We manage rack and stack, structured cabling, network equipment installation, and full site commissioning — under your SOW and within your program timelines.
Infrastructure programs require tight coordination between remote architects and local execution teams. We bridge that gap — acting as your certified local delivery unit with clear escalation paths and structured reporting.
TC Tech Infra maintains structured on-site dispatch capability across major Brazilian metropolitan regions, enabling consistent SLA-aligned execution regardless of program scale or complexity.
Infrastructure deployment across Brazil is backed by Dell Technologies Corrective Maintenance certification spanning PowerEdge rack, tower and modular servers, PowerStore, PowerScale and Unity XT storage, Data Domain and Avamar backup platforms, and VPLEX and Connectrix SAN fabric. Deployment work follows TIA-942 reference practice for data-center builds and TIA-606 labeling discipline so the plant reads clean at handover, with OTDR-tested fiber and certified copper links recorded in the as-built package. Microsoft AZ-900, MS-900 and SC-900 support cloud-adjacent scope. Active operational delivery includes field engineering and dispatch programs for Tier-1 global IT service providers and large international consultancies, both under NDA and SOW. TC Tech Infra operates a Brazilian CNPJ under the service-export framework with SWIFT/BIC-capable corporate banking.
All client programs initiated under Non-Disclosure Agreement before any operational detail is shared.
Full Statement of Work compliance with milestone tracking, deliverable documentation, and structured sign-off.
Guaranteed response times with auditable records. 4h/8h on-site SLA compliance across all active regions.
End-to-end asset tracking from receipt to installation, with photo evidence and documented transfer records.
WCR generation, photo-based field reports, and inventory logs delivered in client-specified formats.
Aligned with global MSP vendor standards. Escalation paths, remote coordination, and ticket-based dispatch.
A central program desk owns the rollout plan and dispatches technicians per region against it. Sites are grouped into waves by geography and access constraints, and each site closes with the same as-built and photo-evidence package — so program reporting stays uniform whether the site is in São Paulo or the interior.
Labeled plant records to TIA-606, OTDR and certified copper test results, rack elevations and port maps, asset and serial logs, and time-stamped photo evidence at each phase. Deliverables ship in PDF, JSON or your own template so they drop straight into your CMDB.
Yes — access lists, escort rules, loading docks and freight elevator windows are coordinated before dispatch. This is the part of Brazilian deployments that most often burns remote teams, so it is handled as a scheduled workstream rather than improvised on arrival. After-hours and weekend change windows are supported.
Both. Client-shipped equipment is received, staged and inventoried against your manifest with discrepancies reported before installation. Where a program has no import pipeline, compatible enterprise hardware can be sourced locally. The model is agreed in the SOW before mobilization.
Dell Technologies Corrective Maintenance certification covers PowerEdge, PowerStore, PowerScale, Unity XT, Data Domain, Avamar, VPLEX and Connectrix. Microsoft AZ-900, MS-900 and SC-900 cover cloud and security fundamentals. Cabling and data-center work follows TIA-568, TIA-606 and TIA-942 reference practice.
TC Tech Infra operates a Brazilian CNPJ under the service-export tax framework. Invoices are settled through a SWIFT/BIC-capable corporate account.
To initiate this service in Brazil or LATAM, provide your operational requirements below. Our team will respond within one business day.
Our team will be in touch within one business day.